Brady Repower Geothermal Power Plant

Scope of Work:

  • Installation of one 11.4 MW energy converter
  • Upgrade one existing 4.5 MW converter and BOP installation and modification
  • Structural steel and millwright
  • Rigging, piping, inspection, testing of repowering project