Projects


Basin Electric Power Cooperative

Pioneer Generation Station,
Williston, ND


Scope of Work:

  • Topsoil stripping, stockpiling, and respread
  • Common excavation and embankment
  • Storm sewer piping, catch basins, and outlet structures
  • Storm water pond construction with riprap out flow protection
  • Access road preparation
  • Tensar geogrid fabric installation
  • Install Class 5 access roads
  • Finish Grading

Categories